VEVOR Bucket Integral Digging Tooth Instruction Manual

Home » VEVOR » VEVOR Bucket Integral Digging Tooth Instruction Manual

VEVOR-LOGO

VEVOR Bucket Integral Digging Tooth

VEVOR-Bucket-Integral-Digging-Tooth-PRO

Product Overview

The serial number NAME The length (mm) teeth(PCS) pin(PCS) Bolt + nut(PCS)
1 48 inch 1200 6 6 4
2 60 inch 1505 6 6 4
3 66 inch 1657 7 7 4
4 72 inch 18096 7 7 4

VEVOR-Bucket-Integral-Digging-Tooth-1

Product assembly instructions

  1. place the bucket motherboard according to the bucket size in bucket corresponding position, if there is a hole bucket on both sides of the edge, it shall, in accordance with the reserved hole position will bolt installation, product main board and bucket maintain tightness state (note: if there is no hole on the bucket, it should be according to the products are mainly on the holes punched on the bucket, then to product for installation).
  2. place the tooth one by one according to the position of the tooth root on the mainboard for installation;
  3. put the pin in accordance with the reserved holes on the tooth one by one, need to use a hammer to knock into the hole, ensure that the pin is complete into the hole, ensure the installation and assembly of the tooth and bucket;
  4. Assembly is complete.

Leave a Comment