
SPH3000-6000TL BL-UP
Quick Guide
Contents
Overview

| 1. Front panel 2. Double color LED 3. LCD screen 4. Push button 5. Wall hole 6. Magnetic devices |
7. Heat sink 8. PV switch 9. PV connector 10. Grounding screw 11. EPS connector 12. Reserved hole |
13. AC grid connector 14. USB port 15. communication ports 16. DIP and Dry connector 17. Battery power terminal |
Note:
- This file will be updated from time to time due to product upgrades or other reasons. Unless otherwise agreed, this document is intended as a guide only. All information and suggestions do not constitute an express or implied warranty. The final interpretation of the content is at Growatt.
- This document is for quick guidance installation only. For details, please refer to the User Manual. 3. Machine damage caused by failure to follow the content is not covered by the warranty.
Installation
System Overiew

Note:
- The installation of this hybrid system needs to comprehensively consider the position of the battery and the power collector.
- You can choose CT or electric meter to connect to the inverter. If there are strict requirements on the limited output power, it is recommended to use an electric meter.
2.1 Installation requirements

2.2 Wall mounting

Note:
Be careful : Avoid water and electricity pipes when punching holes in the wall, otherwise it may be dangerous.
2.3 Monitoring device installation

Follow the installation steps:
- Remove the USB waterproof cover.
- Plug in the communication module.
- Lock the communication module.
Connecting cables
Please prepare the cable before connecting as follows.
| Number | Cable name | Type | Recommend module |
| 1 | grounding cable | Single multi-core yellow-green copper cable | Cable diameterAWG10 |
| 2 | AC output cable | Two or three different color multi-core copper cables | Cable diameter>AWG10 |
| 3 | PV input cable | Photovoltaic dedicated cable(such as PV1-F ) | 4mm2 – 6mm2 |
| 4 | Battery power cable | Red and black multi-core copper | Cable diametenAWG6 |
| S | Other communication cable | CATSE | / |
Note:
- Lithium battery has its own power line and communication line, so use them.
- Hybrid inverter include the basic communication line. So use them directly.
- Please make sure all the switches off before connection. For your safety, please do not operation when power on.
3.1 Grounding

3.2 AC GRID and UPS output connection

The following diagram shows the AC output terminal of the Australian machine connection steps, EPS output terminal connection steps consistent with the above steps.


3.3 DC connection
3.3.1 PV input terminal installation

3.3.2 Plug in PV terminal

Notes:
- Please make sure the PV input voltage/current not beyond the specification before plug in.
- When installing the PV terminal, pay attention to the distinction between the positive and negative terminals and the one-to-one correspondence between the terminals and hybrid inverter.
- When the terminal is docked, there is a click sound. After the terminal is docked, gently pull the PV cable to observe whether the terminal is shaking or not.
3.3.3 Battery power line connection

Installation steps as follow:
- Pass the battery power cables through the tightening nut, waterproof rubber plug and waterproof cover.
- Press OT terminal at the end of cables.
- Connect the power cable to hybrid inverter. Be careful the polarity.
- Be careful not to tighten the tightening nut at this time. After all the communication cables are installed, tighten them together.
3.3.4 Communication cables installation

When all the communication lines are installed, push the waterproof cover into the bottom, lock the screws fixed to the frame, and finally lock the waterproof cap.
Post-installation check
| Number | Acceptance Criteria | Number | Acceptance Criteria |
| 1 | Hybrid inverter is installed correctly and firmly | 2 | shineWiFi-X or shinelink-X or shine4G-X is installed correctly and firmly. |
| 3 | Cable wiring is reasonable, meets the requirements, no broken skin, etc. | 4 | The ground wire confirms the connection and is reliable. |
| 5 | All switches off | 6 | All wires are correct and securely connected. |
| 7 | Cable tie port trimming, no sharp corners, etc. | 8 | All exposed terminals are well protected, no vacant ports. |
| 9 | Pay attention to packing all the residual materials. |
On off hybrid inverter
Notes:
Before power on, please make sure all of the voltage and current are in the range of specification of hybrid inverter. Otherwise it will be damage to hybrid inverter. Follow are the steps of turn on actions:
- Turn on PV switch.
- Turn on the switch between Grid and hybrid inverter.
- Turn on the switch between battery and hybrid inverter and wake up battery.
- If need to setup hybrid inverter. Please turn to user manual of hybrid inverter for detail description.
- The shutdown steps are opposite to the above order.
Status of hybrid inverter
Customer can read more information by push button. Follow are the instruction of button and LED.
| Mark | Description | Explanation | |
| Push-button | Operation of display screen and set system | ||
| Status symbol of SPH | Green light on | SPH run normally | |
| Red light on | Fault state | ||
| Green light blinking | Alarm state | ||
| Red light blinking | 1.Bypass state 2.Software updating | ||
Example diagram of N-wire grounding method
|
|
Service and contact
Shenzhen Growatt New Energy Co., Ltd
4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave, Bao’an District, Shenzhen, China
T +86 0755 2747 1942
E [email protected]
W www.ginverter.com
https://oss.growatt.com:80/common/knowledgeShareH5No?lang=en&type=31
![]()
GR-UM-179-A-02