bathlife Dagg Tapp Ceiling Shower Set
Contents
Important information
![]() |
Before installation, check the following component list carefully |
![]() |
Before installation, flush pipes carefully |
![]() |
For installation, hire a licensed and/or authorised professional. |
![]() |
For installation, connect the hot and cold water supply properly |
![]() |
After installation, turn on the water to check leakage in each joint. |
Recommended operating temperature: 4 −90 °C
Recommended operating pressure: 1 − 6 bar
Tools
- Spirit-level
- Measure tape
- Drill
- Pen
- Spanner
- Allen key
- Screw driver
- Wall drill bit
Components
Tightening
- Drill
- Seal
- Plug
- Screw
Concrete or other massive material.
Wood beams, nogging pieces, or other base tested and approved for mounting, such as some boards.
Assembly
Drawing
DAGG TAPP
All dimension has error ± 5 mm, the actual installation size should be basic on the actual product.
Maintenance
![]() |
If you have questions, please contact us. |
![]() |
If any part is broken, do not use the product before repairing it |
![]() |
When cleaning, do not use bleaching or abrasive chemicals. |
![]() |
When cleaning in general, use a soft cloth and gloves. |
Turn off all valves to stop any water flow during any maintenance
Removing or inserting cartridge
Perform the steps in the reverse order after inserting a new cartridge.
Cleaning of cartridges
Once removed, soak the cartridge in detergent or white vinegar for 1 hour. After, rinse thoroughly with water. Reinsert according to the removal and reinsertion guide