
Contents
INSTALLATION STEPS
![]() |
![]() |
![]() |
| Clean the wall and keep the wall dry. | The viscose is first pasted on the back of the product, tear down the protective film. | Press the wall for 10 seconds and use it at 24 hours. |
DISASSEMBLY STEPS
![]() |
![]() |
![]() |
| Heat the viscose with a blower. | Use an art knife to cut back the back of the viscose. | The adhesive can be removed by alcohol. |
USABLE WALLS
Metal wall Smooth wood Ceramic tile Glass Smooth marble
UNUSABLE WALLS
Cement wall Paint the wall Brick wall Rough wall Wall paper
Uim service: We guarantee to provide high-quality service, if you have any questions, please contact us in time.






